Conduit Offset, Kick & Saddle Bend Calculator
Bending math for EMT and rigid conduit: distance between bends for an offset at 10°, 22.5°, 30°, 45° or 60° (multipliers and shrink), three-point and four-point saddle marks, and the travel of a kick — with the shrink to subtract before the first mark.
How it works
Distance between offset bends = rise × multiplier, multiplier = 1 ÷ sin(angle) (10° 5.76, 22.5° 2.61, 30° 2.0, 45° 1.41, 60° 1.15); shrink = rise × (1 − cos) ÷ sin ≈ 1/16, 3/16, 1/4, 3/8, 1/2 in per inch; three-point saddle: outer marks = rise × 2.5 from centre, shrink 3/16″ per inch
An offset moves a conduit run sideways around an obstruction with two equal and opposite bends; trigonometry sets the distance between them — the rise divided by the sine of the angle, which electricians memorise as multipliers (2 for 30°, 1.41 for 45°). Bending also consumes length, so the run “shrinks” by an amount that grows with the angle, and the first mark must be moved that far past where the offset is needed. A three-point saddle clears a pipe by bending 45° in the centre and 22.5° back on either side, with the outer marks 2.5 times the rise away; a four-point saddle is simply two offsets back to back. Shallow angles make the easiest wire pulls but need room; 30° is the everyday compromise. Whatever the angle, both bends must be in the same plane or the run will dog-leg.
Worked example
A 6″ offset at 30° needs the marks 12″ apart (6 × 2) and shrinks the conduit about 1.6″ (the ¼″-per-inch rule says 1½″). To start the offset 40″ from the end, put the first mark at 41.6″ and the second at 53.6″; at 45° the marks would be 8.5″ apart with about 2½″ of shrink.
Frequently asked questions
Why did my offset come out too short?
The shrink was not added — the conduit lost length in the bends — or the second bend was not exactly the same angle. Measure the angle against a protractor or the bender’s marks, not by eye.
How much clearance over the obstruction?
Add ½–1″ to the rise for clearance and the conduit’s own diameter when the measurement is taken to the bottom of the pipe.
Related calculators
Engineering estimate for planning; installations must be designed and verified by a qualified electrician or engineer to the local code (NEC, IEC, CEC) and manufacturer data.