Deck Ledger Bolt & Lag Screw Spacing Calculator (IRC R507.9)
Get the on-centre spacing for ½ inch lag screws or through-bolts fastening a deck ledger to the house band joist from the IRC ledger fastener table by joist span, with stagger pattern, edge distances, total fastener count for the ledger length and the rule against fastening through brick or stucco.
How it works
Spacing from IRC Table R507.9.1.3(1) by joist span and fastener type (two staggered rows); count ≈ (length × 12 ÷ spacing + 1) × 2
Ledger failure is the leading cause of deck collapses, and the code answer is a prescriptive fastener schedule: half-inch lag screws or through-bolts in two staggered rows, at a spacing that tightens as the joists — and therefore the load per foot of ledger — get longer. Through-bolts carry roughly twice what lags do, so their spacing is wider, and stacked washers to bridge a thick sheathing gap cost some capacity. The edge distances keep the fasteners out of the splitting zone at the top and bottom of the members, and the rest of the section forbids the details that have actually killed people: ledgers screwed through brick or stucco, hung on cantilevered floors, or fastened with nails.
Worked example
A ledger carrying 12 ft joists needs ½″ lag screws at 15″ on centre in two staggered rows (through-bolts could be 29″); a 16 ft ledger takes about 28 lags, plus the pairs at each end and two hold-down tension ties for lateral load.
Frequently asked questions
Can I use structural screws instead of lags?
Yes — proprietary ledger screws (LedgerLOK, SDWS etc.) are listed with their own spacing tables, often similar to the lag column; use the manufacturer's table, not this one.
What if my house has a cantilevered floor or brick veneer?
You cannot ledger to it prescriptively — build the deck freestanding with its own beam and posts along the house side, set on footings.
Related calculators
Span values follow the IRC 2021 deck provisions (R507) and AWC DCA 6 for #2 grade lumber at 40 psf live + 10 psf dead load, wet-service, simplified to the common cases. Local amendments, snow loads, hot tubs, cantilevers and other species/grades change the numbers — confirm with the local building department or an engineer.