Electrical Load Calculator

Estimate a home’s total electrical service load with the NEC standard method — general lighting demand plus appliances — and the service amps at 240 V.

Living area
Small-appliance circuits
Laundry circuits
Fixed appliances
Larger of heat / AC
Range / oven
Loading calculator…

How it works

general = ft² × 3 + small-appliance × 1500 + laundry × 1500 · general demand = 3000 at 100% + remainder at 35% · total VA = general demand + appliances + HVAC + range · amps = VA ÷ 240

The NEC standard method (Article 220) starts from a per-square-foot lighting allowance of 3 VA, adds the fixed small-appliance and laundry circuits, then applies a demand factor because not everything runs at once — the first 3,000 VA counts fully and the rest at 35%. Fixed appliances, the larger of heating or cooling, and the range are added, and the total is divided by the 240 V service voltage to get the amperage that sets the panel size.

Worked example

A 1,500 ft² home: general = 1,500 × 3 + 2 × 1,500 + 1,500 = 9,000 VA. Demand = 3,000 + (9,000 − 3,000) × 0.35 = 5,100 VA. Add 5,000 W fixed + 3,500 W HVAC + 8,000 W range = 21,600 VA total, ÷ 240 = 90 A — comfortably served by a 100 A panel.

Sources: NEC Article 220 dwelling load (Wikipedia)

Frequently asked questions

Standard method or optional method?

This uses the standard method, which is conservative and works for any dwelling. The optional method (Article 220.82) applies a flatter 40% factor above the first 10 kVA and often yields a smaller service; electricians choose whichever the code allows and the AHJ accepts.

Why 240 V and not 120 V?

Residential service in North America is split-phase 240/120 V, and the whole-house load is calculated across the full 240 V. Individual 120 V branch circuits draw from one leg, but the service capacity is figured at 240 V.

Is 200 A always enough?

For most homes, yes. Large houses, electric heat, EV charging and shop equipment can push past it, and the calculation — not a rule of thumb — is what tells you when to step up to 300 or 400 A.

Related calculators

Educational estimates only — electrical work must follow the National Electrical Code (NEC) and local amendments, and be done or inspected by a licensed electrician.