Calculate Lean process cycle efficiency — value-added time ÷ total lead time — with non-value-added time and typical and world-class PCE benchmarks for your type of process.
How it works
PCE = Value-added time ÷ Total lead time × 100 · Non-value-added time = Lead time − Value-added time · Lead time at a target PCE = Value-added time ÷ Target PCE
Process cycle efficiency is the Lean Six Sigma measure of how much of a process’s elapsed time actually adds value for the customer. Most processes are dominated by waiting, queues, transport and rework, so PCE is often below 10%. Michael George’s Lean Six Sigma benchmarks put typical PCE at about 1% for machining, 10% for fabrication, 15% for assembly, 30% for continuous processes, 10% for transactional and 5% for creative work, with world-class levels of 20–80%. By Little’s law, cutting work-in-process is the main lever for shortening lead time and raising PCE.
Worked example
An assembly order spends 6 hours in value-adding work out of a 120-hour lead time, so PCE = 6 ÷ 120 = 5.00%, with 114 hours of non-value-added time. That is below the typical 15% for assembly; reaching the world-class 35% would mean a lead time of 6 ÷ 0.35 = 17.1 hours.
Sources: Quality America — Process cycle efficiency benchmarks (after M. George, Lean Six Sigma) · iSixSigma — Process cycle efficiency (PCE)
Frequently asked questions
How do you calculate process cycle efficiency?
Divide value-added time by total lead time and multiply by 100. 6 hours of value-added work in a 120-hour lead time is 5% PCE.
What counts as value-added time?
Steps that change the product or service in a way the customer cares about and would pay for, done right the first time. Waiting, moving, inspecting, approving, reworking and storing are non-value-added, even if some are currently necessary.
What is a good PCE?
Below 10% is common. Lean benchmarks consider about 25% world class for many manufacturing processes, 50% for transactional processes and up to 80% for continuous processes. Compare against processes of the same type.
How can I improve process cycle efficiency?
Shrink the non-value-added time: reduce batch sizes and work-in-process, remove approval queues, balance the flow and cut setups. Speeding up the value-added steps barely changes PCE when waiting dominates.