Shiplap Calculator
How many shiplap or tongue-and-groove boards for a wall or ceiling: net area after doors and windows, exposed board width, board length, waste, nails and cost.
How it works
net area = length × height − openings · linear length = net area ÷ exposed width × (1 + waste) · boards = ⌈linear length ÷ board length⌉ · nails ≈ rows × studs × 2
Shiplap and tongue-and-groove boards overlap, so coverage depends on the exposed face, not the nominal width: a 1×6 shiplap board (5½″ actual) shows about 5⅛″ (13 cm), and a 1×8 about 6⅞″ (17.5 cm). Divide the net wall area by that face to get the running length, add 10% for cuts and defects (15% for diagonal patterns or many openings), then divide by the board length. Boards are face-nailed with two nails into every stud, which sit 40 cm (16″) apart, or blind-nailed through the tongue on tongue-and-groove.
Worked example
A 4 m wall 2.5 m high with 2 m² of openings leaves 8.0 m² to cover. With 1×6 shiplap showing 13 cm, that is 8 ÷ 0.13 = 61.5 m of board, or 67.7 m with 10% waste, so 67.7 ÷ 3.05 = 22.2 → 23 boards of 3.05 m (10 ft), costing $276.00 at $12 each. The wall takes 20 rows of boards and about 440 nails (2 per stud, 11 studs).
Sources: Western Wood Products Association — lumber sizes · USDA Forest Products Laboratory — Wood Handbook
Frequently asked questions
How do I calculate how much shiplap I need?
Multiply wall length by height, subtract doors and windows, divide by the exposed width of one board to get the running length, add 10% waste, and divide by the board length to get the number of boards.
What is the exposed width of 1×6 shiplap?
A 1×6 board is 5½″ wide, but the rabbet overlap hides about ⅜″, so each board covers about 5⅛″ (13 cm). A 1×8 covers about 6⅞″ and a 1×10 about 8¾″.
How much waste should I add for shiplap?
About 10% for a plain wall, 15% when there are many windows, outlets or a staggered pattern, and up to 20% for diagonal or herringbone layouts.
Do I need to nail shiplap into studs?
Yes, nail into the studs or into horizontal blocking. Use two finish nails per stud for face-nailed shiplap, or one angled nail through the tongue for tongue-and-groove boards. On drywall, construction adhesive helps between studs.
Related calculators
This calculator is for educational purposes. Double-check important results before acting on them.