Trench Slope, Benching & Spoil Calculator (OSHA Soil Types)
Size a sloped or benched trench to OSHA 1926 Subpart P: maximum allowable slope for soil type A, B or C, top width for a given depth and bottom width, excavation and spoil volume with swell, spoil pile setback, and when a trench box or shoring is required instead.
How it works
Top width = bottom + 2 × depth × slope ratio (A ¾:1, B 1:1, C 1½:1); section area = (bottom + top) ÷ 2 × depth; bank yd³ = area × length ÷ 27; loose = bank × (1 + swell)
Trench collapses kill workers every year, and OSHA's Subpart P requires every trench 5 ft or deeper to be protected by sloping, benching, shoring or a shield. The allowable slope depends on soil classification by a competent person: cohesive Type A clay can stand at ¾ horizontal to 1 vertical, typical Type B at 1:1, and granular, wet or previously disturbed Type C — the most common on utility work — only at 1½:1, which makes an 8 ft deep trench 27 ft wide at the top. That geometry drives the excavation volume, the spoil to be stockpiled at least 2 ft back from the edge, the truck count and the working corridor, which is why trench boxes dominate in tight streets even though they cost more per day. Anything deeper than 20 ft needs an engineer's design.
Worked example
An 8 ft deep, 3 ft wide, 100 ft long trench in Type B soil sloped at 1:1 is 19 ft wide at the top: 88 ft² of cross-section, 326 yd³ of bank excavation and about 407 yd³ loose at 25% swell — 34 twelve-yard truckloads if hauled. A trench box would cut the dig to 89 yd³ and the top width to 3 ft.
Frequently asked questions
How is soil type determined?
A competent person combines at least one visual test and one manual test (pocket penetrometer or thumb test for unconfined compressive strength, plasticity, dry strength). Fissured, vibrated, layered-toward-the-trench, previously disturbed or wet soil can never be Type A.
Can I slope the top and box the bottom?
Yes — the shield must extend at least 18 inches above the point where the slope begins, and the slope above it must meet the soil-type table. This combination is common for deep utility trenches.
Related calculators
Standard material-handling and site-safety arithmetic (OSHA 1926/1910, ASME B30, manufacturer data-plate conventions). The equipment's own load chart, data plate and a competent person's site assessment govern; never exceed rated capacity.