InfyCalculator
🔨

Welder Duty Cycle Calculator

Welding machine duty cycle calculator: how many minutes in ten you can weld at a given amperage, the allowable current for continuous welding, the duty cycle at any other output using the rated-current relationship, and the cool-down needed.

Rated output on the nameplate
Rated duty cycle at that output
Amperage you will weld at
Duty cycle period
Ambient temperature
Loading calculator…

How it works

D₂ = D₁ × (I₁ ÷ I₂)² (capped at 100%); continuous current I₁₀₀ = I₁ × √D₁; weld time per period = D × period

A welder's duty cycle is the share of a 10-minute period (5 minutes on older US ratings) that it can deliver a given current before its thermal protection trips: "200 A at 40%" means four minutes of welding and six of cooling. Because resistive heating rises with the square of the current, backing off the amperage extends the allowable time dramatically — the same machine typically runs continuously at about 63% of its rated current — while pushing above the rating collapses it. Ratings are tested at 40 °C ambient; a hot shop or blocked fan intake trips the cut-out sooner. Hobby inverters advertise high peak amps but often only 20–30% duty there, which matters for long structural seams and for aluminium, which needs high current.

Worked example

A machine rated 200 A at 40% can weld 4 minutes in 10 at 200 A; at 160 A the duty cycle rises to 40% × (200/160)² = 62.5% (6.3 minutes), and at 126 A it runs continuously. At 220 A it drops to 33%.

Frequently asked questions

Does the duty cycle reset if I stop for a long time?

Yes — after a full cool-down the period starts fresh. The rating describes steady-state repeated cycles; a single short burst above the rating is fine as long as the machine has cooled.

Why is the same machine rated differently in the US and Europe?

Test conditions: IEC 60974-1 uses a 10-minute period at 40 °C; older NEMA ratings used 5 minutes and sometimes lower ambient, giving a higher-looking percentage for the same hardware.

Related calculators

Guidance values from published welding references (AWS D1.1 / EN 1011 style preheat bands, typical deposition efficiencies). Always follow the qualified welding procedure specification (WPS), the consumable data sheet and the machine nameplate; verify preheat and interpass temperatures with a contact thermometer or temperature crayon.