Waffle slab (ribbed or two-way joist slab) quantities: concrete volume, number of void formers or pans, equivalent thickness, self-weight, topping mesh and an ACI 318 rib and topping check.

Units
Slab length (m or ft)
Slab width (m or ft)
Void former / pan (side × side × depth)
Rib width
Topping (compression slab)
Solid zones (column heads, edge beams)
Concrete waste allowance
Loading calculator…

How it works

module = (pan + rib)² · voids per m² = pan² × pan depth ÷ module · concrete = ribbed area × (pan depth + topping − voids per m²) + solid area × total depth · pans = ⌈ribbed area ÷ module⌉

A waffle slab (losa reticular, two-way joist slab) replaces most of a thick solid slab with a grid of ribs, using reusable pans or lost polystyrene or block void formers (casetones). Each module is the pan plus one rib, so the concrete per square metre is the full depth minus the void volume. Solid zones around columns and along edge beams are added at full depth. ACI 318 (§9.8) treats it as joist construction when ribs are at least 4″ (10 cm) wide, no deeper than 3.5 times their width, spaced no more than 30″ (76 cm) clear, with a topping at least 2″ (5 cm) and 1/12 of the clear spacing. Reinforcement must come from a structural design.

Worked example

An 8 × 6 m (48.0 m²) slab with 60 × 60 × 25 cm pans, 15 cm ribs and a 5 cm topping: each 0.75 × 0.75 m module leaves 0.16 m³ of void per m², so the ribbed 90% (43.2 m²) takes 43.2 × (0.30 − 0.16) = 6.05 m³ and the solid 10% takes 4.8 × 0.30 = 1.44 m³ — 7.49 m³ of concrete (7.86 m³ with 5% waste). That is an equivalent 15.6 cm solid thickness, 48% less than a solid 30 cm slab, and it needs 77 pans.

Sources: ACI 318-19 — Building Code Requirements for Structural Concrete, §9.8 joist systems · CRSI — Design of two-way joist (waffle) slabs

Frequently asked questions

How much concrete does a waffle slab use?

With 60 × 60 × 25 cm pans, 15 cm ribs and a 5 cm topping, about 0.14 m³ per m² in the ribbed zone — roughly half of a 30 cm solid slab. Solid column heads and edge beams add more.

How many void formers (casetones) per square metre?

One per module: 1 ÷ (pan + rib)². With 60 cm pans and 15 cm ribs that is 1 ÷ 0.75² = 1.78 per m²; with 12 cm ribs, 1.93 per m².

What is the minimum topping for a waffle slab?

ACI 318 asks for at least 2″ (5 cm) and at least 1/12 of the clear distance between ribs — 5 cm for 60 cm pans and about 6.7 cm for 80 cm pans — plus welded mesh for shrinkage.

When is a waffle slab worth it?

For spans of about 8–15 m (25–50 ft) or heavy loads, where a solid slab would be very thick. The ribs save 35–55% of the concrete and weight for the same depth.